• Home
    • El Camino
    • Impala
    • 64 Volvo 1800S
    • Willys Whippet Rat Rod
    • 65 GTO Project
    • 1969 Project GTO
    • 72 Road Runner Project
    • Jeep
    • 1965 Mustang Fastback
    • 1970 Chevelle SS
    • 641/2 Mustang
    • 66 Chevy Wagon
    • 1999 Jeep Wrangler
    • Dodge Magnum
    • 2016 Mustang GT
    • Bike Projects
    • 1966 Chevelle
    • Barth MotorHome
    • Austin-Healey
    • Bikes
    • BMW Bike
  • The Garage Kustoms Chix
  • Blog
  • Facility
Menu

The Garage Kustoms

Street Address
Grafton, OH, 44044
Phone Number

Your Custom Text Here

The Garage Kustoms

  • Home
  • Past Projects
    • El Camino
    • Impala
    • 64 Volvo 1800S
    • Willys Whippet Rat Rod
    • 65 GTO Project
    • 1969 Project GTO
    • 72 Road Runner Project
    • Jeep
  • Current Projects
    • 1965 Mustang Fastback
    • 1970 Chevelle SS
    • 641/2 Mustang
    • 66 Chevy Wagon
    • 1999 Jeep Wrangler
    • Dodge Magnum
    • 2016 Mustang GT
    • Bike Projects
    • 1966 Chevelle
    • Barth MotorHome
    • Austin-Healey
  • Bikes
    • Bikes
    • BMW Bike
  • Videos
  • The Garage Kustoms Chix
  • Blog
  • Facility

1969 Project GTO

This was a basket case restoration. The metal work fabrication took months. Customer complained of buckets of water in the trunk. Quarter panels were welded on sideways. That's why collision shops should stick to collision work and that's why there are custom shops. Its plain and simple.The motor was revitalized.  The interior was redone and the convertible top replaced.But the end result of this show quality car was worth the time and effort. I think you will agree the transformation was spectacular. 

1969 Project GTO

This was a basket case restoration. The metal work fabrication took months. Customer complained of buckets of water in the trunk. Quarter panels were welded on sideways. That's why collision shops should stick to collision work and that's why there are custom shops. Its plain and simple.The motor was revitalized.  The interior was redone and the convertible top replaced.But the end result of this show quality car was worth the time and effort. I think you will agree the transformation was spectacular. 

breanna 92010 080 - Copy.JPG
69 gto.JPG
gto 016.JPG
gto 012.JPG
gto 7-29-10 003.JPG
gto 015.JPG
gto4 012.JPG
gto5 008.JPG
gto 010.JPG
gto 014 (2).JPG
gto2 002.JPG
gto2 004.JPG
gto2 013.JPG
gto4 005.JPG
gto5 012.JPG
gto5 011.JPG
gto 3 007.JPG
gto4 008.JPG
gto 013 (2).JPG
impala gto 7 10 016.JPG
gtoengine2.JPG
gtoengine1.JPG
nick b day and gto work 027.JPG
gto 2011 001.JPG
nick b day and gto work 026.JPG
gto9092.JPG
gto 10-14-209 053.JPG
nick b day and gto work 021.JPG
nick b day and gto work 017.JPG
breanna 92010 102 - Copy.JPG
breanna 92010 048.JPG
breanna 92010 100.JPG
breanna 92010 056.JPG

GTO Project

breanna 92010 044.JPG

POWERED BY SQUARESPACE.